Supply and Construction of Drilling Control Room

Supply and Construction of Drilling Control Room

Client

BHP – Minera Escondida

Location

Antofagasta

Period of Execution

July 2024 – May 2025

Description

The works to be performed consist of:

  • Manufacture of the modular control room and technical room building
  • Installation of raised floors
  • Installation of Novec gas system and biometric controls
  • Embedsion of the modular building
  • Technological equipment, technical room
  • Conditioning and PEM

Por favor rellene nuestro formulario de contacto, estaremos encantados de atender sus solicitudes