Client
BHP Escondida
Location
Antofagasta
Period of Execution
03-2023 to 02-2024
Construction Amount
425 m2 of modular manufacturing plant – 90 m3 of prefabricated foundations
Description
The works to be performed consist of:
- Supply of the building and control room
- Supply of technical furniture
- Electrical and instrumentation installation
- Manufacture of reinforced concrete foundations
- Transfer to the site