Enabling ships to maintenance (Office Islas)
The work associated with this project consisted of: Civil works associated with the extension of 2 wings (720 m2) main offices or islands located to the interior of the Titan building.
The work associated with this project consisted of: Civil works associated with the extension of 2 wings (720 m2) main offices or islands located to the interior of the Titan building.
The works were divided into 3 fronts: Casino building plate, Choquera San Francisco, Choquera Titan and Choquera plant SAG. Including structural repairs of flat wetlands, new partitions and repair or replacement of coverings of walls and floors.
Given the constant leaks that were happening in various buildings of the camp Perez Caldera, it was decided to replace the existing surface on the roofs of several buildings
consisted of the construction of a bank of pipelines to carry out the layout of the main line AT power of thickeners at Mine Esperanza.
Traslado campamento Punta Colorado a Óxidos Encuentro
Airline 23 KV underground line for Assembly of new thickeners in mining was modified.
The work developed for the Corporation culture of the Chilean Chamber of construction and at the same time to the Government of Chile consisted of Assembly of more than 950 m3 of laminated wood (radiata pine) structure that arrived from Italy in mid-2016, where this building was originally built for the ExpoMilan where Chile presented its culture and customs. The building, 65 meters long, 15 wide and 15 meters high, was recognized as the 2nd best Pavilion in the category of “Architecture and landscape”, and also won three of the four awards of the contest of sustainability of the fair.
It consisted in the assembly of the warehouse of materials from the main camp of the Project “5400 Improvements of Minera Escondida”