Housing Improvement Perez Caldera Los Bronces
Housing Standard Improvement Bathrooms type W Perez Caldera Los Bronces Divission
Housing Standard Improvement Bathrooms type W Perez Caldera Los Bronces Divission
Installation of new rest rooms and Choqueras in areas of mine and various sectors outside of mine. These new facilities were built to improve the infrastructure of the mine and as requirements to start a new day’s work of mine operations staff.
Transformación de Comedor minera los Bronces a Salas de esparcimiento, entre ellos, Gimnasio, Cine, Pub, Sala de Computación y Sala de Juegos, dándole al personal un lugar idóneo para compartir con los suyos en un espacio abierto limpio y con impecables terminaciones.
Disarmament of the former plant of hydrocyclones plant located in the “Tortolas” Doves in the sector of the main wall of the tailings impoundment. The plant used to have many piping, mechanical and structural elements.
The work associated with this project consisted of: Civil works associated with the extension of 2 wings (720 m2) main offices or islands located to the interior of the Titan building.
The works were divided into 3 fronts: Casino building plate, Choquera San Francisco, Choquera Titan and Choquera plant SAG. Including structural repairs of flat wetlands, new partitions and repair or replacement of coverings of walls and floors.
Given the constant leaks that were happening in various buildings of the camp Perez Caldera, it was decided to replace the existing surface on the roofs of several buildings
consisted of the construction of a bank of pipelines to carry out the layout of the main line AT power of thickeners at Mine Esperanza.
Por favor rellene nuestro formulario de contacto, estaremos encantados de atender sus solicitudes