Punta Colorado camp transfer to Oxidos Encuentro
Traslado campamento Punta Colorado a Óxidos Encuentro
Traslado campamento Punta Colorado a Óxidos Encuentro
Airline 23 KV underground line for Assembly of new thickeners in mining was modified.
The work developed for the Corporation culture of the Chilean Chamber of construction and at the same time to the Government of Chile consisted of Assembly of more than 950 m3 of laminated wood (radiata pine) structure that arrived from Italy in mid-2016, where this building was originally built for the ExpoMilan where Chile presented its culture and customs. The building, 65 meters long, 15 wide and 15 meters high, was recognized as the 2nd best Pavilion in the category of “Architecture and landscape”, and also won three of the four awards of the contest of sustainability of the fair.
It consisted in the assembly of the warehouse of materials from the main camp of the Project “5400 Improvements of Minera Escondida”
The purpose of this project is to build two noise barriers on both sides of the cooling tower of the plant of the Central new Renca (CNR) in order to decrease the noise it produces, and thus comply with the standards in force and required by our legislation.
The works contemplated the construction of two wineries in 704 m2 to the interior of the El Trebal plant of Aguas Andinas, one for the storage of dangerous substances, and one for non-hazardous substances.
For our customer ENAP 2 projects were carried out simultaneously and an additional installation in various parts of the refinery emergency showers.