Construction of four new buildings with capacity for 96 beds each, as part of the expansion of the mining camp contract.
The works developed consisted in the installation of a metal covering and manufactured in construction,
The works developed for this project consisted in enlarging and remodeling more than 850 m2 of surface and 135 m3 of concrete.
Quantity built: 14,600 kg of structures – 115 m3 of concrete
This project consisted of the installation of metal fixing plates that serve as support for machines that remove the mills from the windmills.
500 ml of pipe – 1,500 m3 of earth moving
23,347 kg structure, 127 m3 concrete, 527 m2 architecture repairs
Project Name Disarm Infiernillo Installation Customer Tecno Fast S.A Location Los Bronces Mining Camp Description The disarmament work carried out consisted basically of: Disarmament of
At the beginning of the second semester of the year 2018 we started for Tecno Fast and Angloamerican the construction and modular assembly of the mining camp with the highest wooden buildings in South America.
Por favor rellene nuestro formulario de contacto, estaremos encantados de atender sus solicitudes