Client
BHP – Minera Escondida
Location
Antofagasta
Period of Execution
March 2025 – August 2025
Description
The works to be performed consist of:
- Supply of Workstation Equipment and Monitoring of Autonomous Drills in the Control Room
- Supply, Assembly, and Implementation of Cisco Rack and Switch Systems
- Supply and Installation of Certified Fiber Optic System
- Architectural Renovation