Search
Close this search box.

Contruction for Sheds PTAS – Padre Hurtado

Contruction for Sheds PTAS – Padre Hurtado

Project Name

Proyecto y Construcción de galpones para bodegas, PTAS El Trebal – Padre Hurtado

Customer Client

Aguas Andinas S.A.

Location

Camino El Trebal N° 2095 (Ruta G-262), Comuna de Padre Hurtado, Región Metropolitana.

Quantity built

704 m2 Built

Description

The works contemplated the construction of two wineries in 704 m2 to the interior of the El Trebal plant of Aguas Andinas, one for the storage of dangerous substances, and one for non-hazardous substances.

Given the demands of material that would be both wineries inside is the option was to use prestressed, concrete solution which delivers an adequate resistance to fire.
The developed works are divided in:

  • Development of Engineering (structure, architecture, electricity).
  • Civil works and Assembly of structures of concrete of the sheds.
  • Finishing and Assembly of roofs.

Project closing and delivery of planes.

Por favor rellene nuestro formulario de contacto, estaremos encantados de atender sus solicitudes