Project Name
Cross Canal 640 Ovejería Dam-Codelco
Customer
Codelco
Location
Tranque Ovejería
Quantity built
800 m3 of Earth-more than 95 m3 of concrete
Description
The works to be developed consisted in:
- Deviation of the contour channel for construction of cross.
- Excavation of 600 m3 of Earth.
- Filled with 200 m3.
- Concreting of Radier of support of concrete modules for step to lead the water.
- Assembly of prefabricated concrete modules.
[:]