DURATION: 90 Days
MAGNITUDE: Surface 750 m2, 45,000 kg of metallic structure, 550 m2 of isolated coatings, 800 m2 of isolated cover, 750 m2 of pavements.
DESCRIPTION:It consisted in the assembly of the warehouse of materials from the main camp of the Project “5400 Improvements of Minera Escondida”