DURATION: 120 days
MAGNITUDE: 300 m3 Concrete Demolition – 50 Ton Structure of unarmed.
DESCRIPTION: Disarmament of the former plant of hydrocyclones plant located in the “Tortolas” Doves in the sector of the main wall of the tailings impoundment. The plant used to have many piping, mechanical and structural elements.