Temporary and Permanent Infrastructure Installation for the Centinela Development Project (Camp Installation)

Temporary and Permanent Infrastructure Installation for the Centinela Development Project (Camp Installation)

Client

TecnoFast

Location

Antofagasta

Execution Period

February 2024 – May 2025

Construction Amount

35,000 m² of construction – 4,462 beds available – 796 modular units – 4,500 m² of circulation areas

Description

The work to be carried out consists of:

  • Modular Assembly of Dormitory Buildings
  • Modular Assembly of Auxiliary Buildings
  • Interior Finishes
  • Electrical and Plumbing Installation
  • Prefabricated Foundation Installation
  • Sanitary Installation
  • Primary Care and Fire Network Installation
  • Circulation Construction
  • Enabling and PEM