Montajes líneas eléctricas espesadores

DURATION: 90 DAYS

MAGNITUDE : 350 ml of Banks of pipelines of concrete piping, 160mm, 1100 m3 of concrete

DESCRIPTION: consisted of the construction of a bank of pipelines to carry out the layout of the main line AT power of thickeners at Mine Esperanza.